Manual Controllers BGV-D8+

PDF Manual Controller for BGV-D8/D8Plus (437 kb) (Pages 24 and 25 / Catalogue 2010)

BGV-D8+ 4 Channel

  • Directcontrol for 4 hoists
  • Emergency stop contactor control
  • Phase- and rotating field monitoring
  • Input CEE-16/5 phase changing plug
  • Output 4 x CEE-16/4
  • Remote control with 6m cable
  • 4 selection switches up/down
  • Go button
  • Emergency stop button
  • Load test display with 4-way selection switch
  • 4 x XLR-5 input for load cells

BGV-D8+ 8 Channel

 

  • Directcontrol for 8 hoists
  • Emergency stop contactor control
  • Phase- and rotating field monitoring
  • Input CEE-32/5 phase changing plug
  • Output 8 x CEE-16/4
  • Remote control with 6m cable
  • 8 selection switches up/down
  • Go button
  • Emergency stop button
  • Load test display with 8-way selection switch
  • 8 x XLR-5 input for load cells

CEE-Distribution Box 4 Channel for D8 and D8+ Controller

  • Output 4 x CEE-16/4 sockets
  • Input harting 16-pin
  • Optional for D8+ controller with 4 Input
  • for load cells
  • Robust aluminium housing

Load Monitoring

  • Output 4 x CEE-16/4 sockets
  • Input harting 16-pin
  • Optional for D8+ controller with 4 Input
  • for load cells
  • Robust aluminium housing

 

   
Standard SR2.0

For special load types where there is a risk of specific elements (e.g. load-attachment points, load-suspension points, electric chain hoists or load-bearing elements) being overloaded, a load measurement is required.

(Excerpt: VPLT Standard SR 2.0 - Bereitstellung und Benutzung von Elektrokettenzügen, 3.1.3 Überlastabschaltung / Überlast-
überwachung)

Please use the contact form for more informations!